Did you know?
The basics of our trade, explained simply.
Plenty of calculations explain electricity, but the aim of these articles is to help you understand the basics of our trade in simple terms.
Did you know?
Understand before you plug in.
Power assessment: what information to gather before asking for a study?
To study a power distribution, five pieces of information are enough to start. And one of them, the diversity factor, can halve the rating.
ReadHVO: what does this renewable fuel change for a generator?
HVO takes the place of diesel, but only in an engine that accepts it. In France, it is called gazole XTL. What it changes, with figures from ADEME.
ReadPowerlock: why connect the earth first?
On a Powerlock connection, the earth is connected first and disconnected last, and the neutral comes before the phases. Here is why.
ReadThe earth rod next to the generator: what is it for?
On a generator, the earth rod does not play the same role in every earthing system: a reference in TN-S, the fault current path in TT. Either way, it is measured.
ReadCable on a drum: why unwind it fully?
Wound on a drum, a cable can no longer shed its heat: with three layers left, a 3G2.5 can no longer carry the 16 A of its socket.
ReadWhy doesn't a generator like running almost unloaded?
Lightly loaded, a diesel generator stays cold, burns its fuel poorly and fouls up: the cure is decided at the power assessment stage.
ReadBlue, red, yellow: how do you read a P17 socket?
Colour, pins and keying: the voltage and supply type of a P17 socket can be read at a glance.
ReadWhy do LEDs trip RCDs?
Leakage from LED drivers adds up on a single RCD. The fix: split the circuits.
ReadkVA or kW: what's the difference?
Active power, apparent power and cos φ: why generators and grid connections are rated in kVA.
ReadWhat is the diversity factor?
Not all equipment runs at full power at the same time. The diversity factor avoids overcapacity.
ReadHow much power can you draw from a P17 socket?
From 3.7 kVA for a 16 A single-phase socket to 277.1 kVA for a 400 A Powerlock: maximums, not targets.
ReadSingle-phase or three-phase: why balance the phases?
The most loaded phase sets the size of the source. Spreading equipment evenly avoids oversizing.
ReadWhat is event power distribution?
Every event is unique, and so is its set-up. And why ilotage (sharing a supply between stands) is banned at trade shows.
ReadWhat is a Twin zero-interruption generator set?
Two synchronised generators sharing the load: if one goes down, the other takes over, with no interruption at all.
ReadCable size depends on current, but also on length!
The longer the cable, the greater the voltage drop. Choosing the cable size takes planning.
ReadWhy does it “trip”?
30 mA RCD, circuit breaker: the distribution box has either saved your life or saved your installation.
ReadA project? Let's talk power.
Venue, dates, known requirements: tell us about your event and we will get back to you quickly.