- A power assessment starts from the list of your equipment: quantity and unit power of each item, in watts.
- Two details change the result: the connection, single-phase or three-phase, and the diversity factor, the share of equipment running at the same time.
- The supply available on site completes the picture: three-phase 400 V or single-phase 230 V.

Before studying a power distribution, our engineering office starts from a [power assessment](https://www.darkside-energy.com/en/glossary/#bilan-de-puissance): the inventory of the event's equipment, with its power, its type of connection and its diversity factor. Five pieces of information are enough to start it.

## The five pieces of information

1. **The equipment list**, area by area, with quantities.
2. **The unit power** of each item, in watts, read on its rating plate or data sheet, with its [cos φ](https://www.darkside-energy.com/en/glossary/#cos-phi) when stated.
3. **The connection**: single-phase or three-phase. Single-phase equipment is then spread across the three phases to balance them.
4. **The [diversity factor](https://www.darkside-energy.com/en/glossary/#foisonnement)**: 1 if all the equipment on a line runs at full power at the same time, less otherwise.
5. **The site supply**: three-phase 400 V or single-phase 230 V.

Missing a power rating? If in doubt, our teams draw on field data gathered since 2016.

## A worked example

Take ten 1,000 W appliances on single-phase 230 V, with a cos φ of 1 (assumption for the example) and the 20% power reserve offered by default in our online power assessment:

- if they all run at the same time (diversity factor 1): 10 kVA, 43.5 A, or 52.2 A with the reserve. You need a single-phase P17 63 A socket and a 12 kVA source;
- if six at most run at the same time (diversity factor 0.6): 6 kVA, 26.1 A, or 31.3 A with the reserve. A single-phase P17 32 A is enough, with a 7.2 kVA source.

Same equipment list, but a rating half the size: the diversity factor weighs as much as the power ratings. It must therefore stay realistic, because if it is too low, the installation is undersized.

## What the study adds

The assessment gives guidance: power to plan for, current on each phase, indicative rating and source. It does not replace a study: installation conditions, selectivity, operating modes and load criticality still need to be checked.

> The equipment list, its power ratings, its connection, its diversity factor and the site supply: with these five pieces of information, the study can start.

Checking your assessment and deriving the right distribution from it is the work of our [event electrical engineering office](https://www.darkside-energy.com/en/engineering/).

Our online power assessment calculates the power to plan for, the current on each phase and an indicative rating. Free demo up to 4 lines.

[Run a power assessment](https://www.darkside-energy.com/en/power-assessment/)

[HVO: what does this renewable fuel change for a generator?](https://www.darkside-energy.com/en/did-you-know/hvo-generator/)

## A project? Let's talk power.

Venue, dates, known requirements: tell us about your event and we will get back to you quickly.

[Request a quote](https://www.darkside-energy.com/en/contact/)
[contact@darkside-energy.com](mailto:contact@darkside-energy.com)